Tunnel Re-Engineered
- 3 hours ago
- 1 min read
We took an existing tunnel footprint at AutoPark Honda in Cary, NC and re-engineered it for improved flow, updated equipment, and long-term reliability.
This wasn’t a new build.
This was a full retrofit.
Retrofits require precision:
• Working within existing infrastructure
• Coordinating utilities and spacing
• Minimizing disruption
• Modernizing performance
The result: a cleaner layout and a stronger-performing system.










Comments